This document describes the manual process to review a PR for a release submission to the Alire's community index.

Purpose of the review process

  • Ensure submitted releases build and resolve on at least some platforms.
  • Keep crate names clear and unambiguous (see POLICY.md).
  • Protect users from broken, misleading, or malicious manifests.
  • Help submitters land good releases, not gatekeep them.

Checks for all releases

  • Wait for CI checks to pass. Do not merge with failing tests unless a justified reason is given in the PR comments.
  • Help the submitter when an error is well known or the cause is readily apparent.
  • Missing dependencies are not a failure by themselves: verify that at least some platforms resolve and build.
  • Build failures caused by dependencies out of the control of the submitter are not a reason to block the PR.
  • Inspect the submitted manifest for anything untoward.
  • For repeat releases, check the Diff workflow output to quickly spot the important changes against the previous release.
  • Tags are meaningful and descriptive.
  • gpr-set-externals settings are appropriate (see Common pitfalls below).
  • System library dependencies are declared and not left implicit. If a needed external crate does not exist yet, request its external to be added in the same PR. Examples: - https://github.com/alire-project/alire-index/blob/stable-1.4.0/index/li/libcurl/libcurl-external.toml - https://github.com/alire-project/alire-index/blob/stable-1.4.0/index/ma/make/make-external.toml

Checks for new crates (first release)

  • The crate name does not collide with a popular existing Ada/SPARK project not yet indexed (see POLICY.md). Do not let a submission impersonate or shadow an established project.
  • Inspect the upstream repository: confirm it is a real project with real code, not a placeholder or squatting attempt, or otherwise deceitful.

Common pitfalls

  • Test-only dependencies in the root crate. Crates depending on e.g. gnattest or gnatprove must not have them in the root crate; those are only for testing the crate itself. Request moving them to a nested crate and point the submitter to the catalog spec section on testing with pins: https://github.com/alire-project/alire/blob/master/doc/catalog-format-spec.md#using-pins-for-crate-testing
  • Use of gpr-set-externals. Setting a GPR external value is:
    • OK to configure the build for the current environment (OS, architecture).
    • OK for crates that produce a binary and are not intended as dependencies.
    • NOT OK to fix the build mode (devel/release) on a library crate; clients must be able to set it themselves.

Approving